ADCP-90-459 • Issue 2 • June 2016
Page 26
© 2016
CommScope
. All Rights Reserved.
Figure 23. Cable Routing for Bulk Storage FMT Panel
6. Route the patch cords within the tray as shown in
Figure 23
.
7
OPERATION
Operation consists of opening the tray, connecting patch cords to adapters or micro-VAMs, and
closing the tray. When routing patch cords, refer to the routing diagrams provided in
Section 6
.
Note: For maximum storage, balance the load between the two sides.
24299-A