InteliLite Global Guide
26
Use cables of 2,5 mm
2
Use transformers to 5 A
Connect CT according to following drawings:
3 phase application:
Image 4.2 3 phase application
It is necessary to ensure that potential difference between generator current COM terminal and battery “-”
terminal is maximally ± 2V. Therefore is strongly recommended to interconnect these two terminals together.
Split phase application:
Image 4.3 Split phase application
IMPORTANT: The second phase of split phase connection is connected to the terminal, where is
normally connected the third phase.
Summary of Contents for InteliLite MRS16
Page 40: ...InteliLite Global Guide 40 4 4 12 Example of MRS Wiring ...
Page 55: ...InteliLite Global Guide 55 ...
Page 56: ...InteliLite Global Guide 56 ...
Page 57: ...InteliLite Global Guide 57 ...
Page 58: ...InteliLite Global Guide 58 ...
Page 59: ...InteliLite Global Guide 59 ...
Page 60: ...InteliLite Global Guide 60 Setpoint Screens ...
Page 61: ...InteliLite Global Guide 61 History Log ...
Page 62: ...InteliLite Global Guide 62 ...
Page 63: ...InteliLite Global Guide 63 ...
Page 64: ...InteliLite Global Guide 64 ...
Page 65: ...InteliLite Global Guide 65 5 3 3 Browsing alarms ...
Page 66: ...InteliLite Global Guide 66 5 3 4 Password Enter password ...
Page 67: ...InteliLite Global Guide 67 Change password ...
Page 68: ...InteliLite Global Guide 68 Note Use Up and Down button to select required level of password ...
Page 69: ...InteliLite Global Guide 69 Log out from controller ...
Page 71: ...InteliLite Global Guide 71 5 3 6 Language selection ...
Page 72: ...InteliLite Global Guide 72 ...
Page 78: ...InteliLite Global Guide 78 Image 5 13 Flowchart of start of diesel engine ...
Page 80: ...InteliLite Global Guide 80 Image 5 14 Flowchart of start of gas engine ...
Page 582: ...InteliLite Global Guide 582 more information see Alarm types Level 2 on page 84 ...