Chassis Pre-Installation
See Figures 15-18
1. Check chassis data plate. Verify chassis is correct for
cabinet. Chassis I.D. sticker should match sticker on
cabinet blower housing.
2. Remove compressor cover, check for any shipping or
handling damage. Make repairs or adjustments.
a. Verify refrigerant tubing is free of kinks or dents
and that it does not touch other tubes or unit
parts as it passes over or through. Adjust if
needed and separate with closed cell insulation.
b. Inspect insulation inside compressor enclosure for
rubs from tubing or reversing valve. Adjust tubing
or RV inward if needed. Be careful not to cause
contact somewhere else.
3. Inspect all electrical connections. Connections must
be clean and tight at the terminals.
4. Replace any panels or covers removed for steps 2-4.
The chassis is now ready for installation. Always keep
chassis upright.
Figure 16
Figure 15
Figure 17: Control Box Cover Removed
Figure 18: Enclosure Removed
CXM/
DXM2
Transformer
Water High
Pressure Switch
RV
TXV
NPSH (BPPT) Male
Fitting for Hose
Filter Drier
Chassis
Data Plate
Compressor
Cover
Compressor
Coaxial
Water/Ref
Coil
Compressor
Capacitor
Pressure
Switches
Electrical Connections
2 - PIN (DDC Controls)
3 - PIN (Line Voltage)
4 - PIN (Fan Motor (ECM CV
Sizes 15-36 and PSC))
5 - PIN (Fan Motor (ECM CV
Sizes 09-12 and ECM CT))
9 - PIN (Thermostat)
Return
(Water Out)
Supply
(Water In)
Contactor
(Optional RIB relay
location 09-18)
Wire Diagram
(on back)
CXM
Test Button
DXM2
Service Tool
Port
Board Flash
Code Window
I.D.
Label
(Match to
Cabinet)
Control Box
Cover
Chassis Model and
Serial Number Sticker