C L I M AT E M A S T E R WAT E R - S O U R C E H E AT P U M P S
TSM/TSL Vertical Stack
R e v. : J a n u a r y 1 8 , 2 0 2 1
C l i m a t e M a s t e r Wa t e r-S o u rc e H e a t P u m p s
22
Leader/Follower Cabinet Installation
2” (50) Minimum
extend copper stubs
for S/R/C if over 3” (75)
Leader
(Style 3)
Follower
Note 4
RA
R
R
R
S
S
S
RA
Field install P-Trap and clamp to
drain riser. Hard drain connection
to be extended into cabinet so clamp
is always accessible.
Field connect
hoses in both cabinets-
supply to supply and return to return.
(Cabinet supply is closest to corner,
chassis supply is on left facing air coil)
Field braze valve package on
follower side (shutoff with tubing)
so shutoff is inside the cabinet
Follower Cabinet
Riser Pads (4)
Note 4
Notes:
1.
Contractor must meet all fire code requirements.
2. Size riser diameter for both units GPM.
3. Leader/Follower means both units share common riser.
4.
Install pads on back of follower cabinet to cover slots
used for S/R risers.