Installation Guide_PV-ezRack_SolarTerraceII-A_AU_V2.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
06
page
of 21
4. System Overview
4.1 Overview of PV-ezRack SolarTerraceII-A
4.2 Precautions during Stainless Steel Fastener Installation
Improper operation may lead to deadlock of Bolts and Nuts. The below steps should be applied to every
stainless steel nut and bolt assembly to reduce this risk.
4.2.1 Reduce the friction coefficient:
(1) Ensure that the thread surface is clean (no dirt or contaminant)
(2) Apply lubricant (grease or 40# engine oil) to fasteners prior to tightening to avoid galling or seizing in the
threads;
①
STII-A, Support (pre-assembled)/ Double support (pre-assembled)
②
STII-A, C-Post
③
STII-A, Post brace for C-Post/Post brace for C-Post On double support
④
STII-A, Post head for C-Post
⑤
T-Rail 110
①
②
③
④
⑤
System Overview