Installation Guide_PV-ezRack_SolarTerraceII-A_AU_V2.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
10
page
of 21
①
②
Install the post head and fix it with the two M12 bolts and nuts supplied. To avoid stainless steel galling/
seizing apply grease or lubricant if needed.
Recommended torques:
Bolt 1 with 50-55 N·m
Bolt 2 with 23-25 N·m
5.2 Post Head Installation
3a.
Click the Post brace into C-Post as shown and connect with the two M12 bolts and nuts supplied.
Recommended torque:
Bolt M12 50~55N·m
5.3 Post Brace Installation
Installation Instruction
Fig. 1
Fig. 2
Bolt 1
Bolt 2
To achieve earthing/
grounding function using
set screws
To achieve earthing/
grounding function using
set screws