Installation Instruction

5.8.2 Place PV Modules on Rails, and fix them with End Clamps and Inter Clamps or Universal 
Clamps, then fasten them with Allen Key. Please choose below Solution 1 or 2 according to your 
project. 
-Solution 1 (Apply End Clamps and Inter Clamps)
Step 1 Place the first PV Module on T Rails according to your plan and apply the End Clamps to fix it 
and then fasten lightly with Allen Key as shown in figure below .

Step2 Slightly lift the PV Module and 
slide Inter Clamps and Grounding 
Clips into position. The teeth on 
Grounding Clip will automatically 
align when the Inter Clamp is properly 
installed as shown in right Figure.

Step 3 Loosely place the next framed 
PV Module into the other side of Inter 
Clamp and Grounding Clip as shown 
in right Figure.

Important Notes: 
-To fix Grounding Clip properly, ensure the frames of PV Modules are completely pressed 
against the Inter Clamp and Grounding Clip. Visually check that Grounding Clips are positioned 
properly.
-Grounding Clips are intended for SINGLE USE ONLY! Do not fasten the bolts down if the 
position of PV Module is not finalized. Only slightly tighten bolts to keep PV Modules in place.

Fig. 19

Fig. 20

Fig. 21

Summary of Contents for PV-ezRack SolarTerrace II-A

Page 1: ...PV ezRack SolarTerrace II A Code Compliant Planning and Installation V2 0 Complying with AS NZS1170 2 2011 AMDT 3 2012...

Page 2: ...and safety regulations Please also check other regulations relevant to your local region Make sure that you are using the latest version of the installation instruction guide which you can do by cont...

Page 3: ...95 Max Vertical Uplift Reaction kN 6 1 6 9 8 8 9 9 12 3 13 0 Max Vertical Down Reaction kN 13 2 13 9 16 6 17 5 20 7 20 2 Max Horizontal Reaction kN 3 9 6 5 5 1 8 6 6 7 6 8 Max Moment at GL kNm 7 9 5...

Page 4: ...ense sand Very Stiff to Hard clays Firm to Stiff Clays 300 150 300 300 600 100 150 Wind Region RegionA RegionB RegionC RegionD Panels tilt angle degrees 20 30 20 30 20 20 Wind speed m s 41 48 59 73 Pa...

Page 5: ...sales clenergy com au www clenergy com au 04 page of 21 Tools Components 3 1 Tools 3 Tools Components Socket Wrench with 19 mm socket Torque Wrench Allen Key 6mm M8 Hexagon Socket Screw Electric Dril...

Page 6: ...support mounting system 3 2 Components ER SP T110 Inter Clamp T Rail 110 Splice for T 110 Rail ER CP 2800 A ER RC T G Rail Clamp for T Rail with grounding pins Post head for C Post with Grounding C Po...

Page 7: ...d to deadlock of Bolts and Nuts The below steps should be applied to every stainless steel nut and bolt assembly to reduce this risk 4 2 1 Reduce the friction coefficient 1 Ensure that the thread surf...

Page 8: ...ening 5 Avoid working at high temperatures 4 2 3 Safe Torques Please refer to safe torques defined in this guide as shown in below figure In case power tools are required Clenergy recommends the use o...

Page 9: ...s and lengths that vary from those shown in this guide The installation process detailed in this instruction guide remains the same regardless of the component size In case you need to do any on site...

Page 10: ...ur particular installation Mark the line of the post array 1b Obtain the maximum allowed distance between posts and the minimum embedment length from the relevant engineering certificate and or projec...

Page 11: ...stainless steel galling seizing apply grease or lubricant if needed Recommended torques Bolt 1 with 50 55 N m Bolt 2 with 23 25 N m 5 2 Post Head Installation 3a Click the Post brace into C Post as sh...

Page 12: ...m au www clenergy com au 11 page of 21 Installation Instruction 3b Post brace on double support installation Click two post braces into C Post as shown and connect with the two M12 bolts and nuts supp...

Page 13: ...3 9239 8024 E mail sales clenergy com au www clenergy com au 12 page of 21 Installation Instruction Connect the brace to the post using the M12 bolt and nut supplied Recommended torque M12 50 55N m T...

Page 14: ...o post head Connect the tubes of the support the to the post braces on the post using the M12 bolt and nut supplied Recommended torque M12 40 45N m Note The lengths of the two tubes are different Make...

Page 15: ...of bolt Bolt 1 with 50 55 N m Bolt 2 with 50 55 N m Bolt 3 with 40 45 N m Bolt 4 with 50 55 N m Bolt 5 with 40 45 N m Bolt 6 with 18 20 N m Make final adjustments to Racking System Adjust vertically...

Page 16: ...se a 6mm Allen key Hex to fasten on another side via Rail Clamp for T Rail Recommended Torque M8 18Nm Note Rail clamps can work on both sides with no pre assembled rail clamp 7b Determine the necessar...

Page 17: ...row Install Grounding Clips at positions marked in diagram Installation number of Grounding Clip number of PV Module Eg 4 Grounding Clips in image shown 5 8 PV Modules Installation 5 8 1 2 Odd number...

Page 18: ...ly with Allen Key as shown in figure below Step2 Slightly lift the PV Module and slide Inter Clamps and Grounding Clips into position The teeth on Grounding Clip will automatically align when the Inte...

Page 19: ...N muntil all PV Modules are properly installed Solution 2 Apply Universal Clamps Step 1 Twist the head of Universal Clamp to change functionality from end to inter clamp as shown in right figure 18 18...

Page 20: ...shown in right Figure Step 3 Place the first PV Module on the T Rails and apply the Universal Clamp in the End Clamp position to fix it and then fasten slightly with Allen Key Make sure the frame of P...

Page 21: ...WG or similar and fasten the bolt M6 14 with 10N m and fasten the bolt M8 25 with 13 5N m as shown in figure below Step 6 Repeat above steps to install all PV Modules Visually check Universal Clamp an...

Page 22: ...does not cover damage to the Product that occurs during its shipment storage or installation This Warranty shall be VOID if installation of the Product is not performed in accordance with Clenergy s w...

Page 23: ...81 45 228 8316 E mail sales clenergy co jp www clenergy jp Clenergy Philippines 145 Yakal St San Antonio village Makati City Philippines Tel 63 977 8407240 E mail sales_ph clenergy com www clenergy p...

Reviews: