Installation Instruction
Note:
Make sure all of Tri-groove beams are
parallel prior to installation of T-Rails.
Check the torque value of bolt:
Bolt 1 with 50-55 N·m
Bolt 2 with 50-55 N·m
Bolt 3 with 40-45 N·m
Bolt 4 with 50-55 N·m
Bolt 5 with 40-45 N·m
Bolt 6 with 18-20 N·m
Make final adjustments to Racking
System.
Adjust vertically: Loosen Bolt 1 and slide
along ellipse hole.
Adjust Tri-groove beam parallel: Loosen
Bolt 2 and Bolt 3, turn Post Head slightly,
move Al Tube left and right until being
parallel. Keep all of Tri-groove beams
parallel at same level.
5.6 System Adjusting