Installation Guide_PV-ezRack_SolarTerraceII-A_AU_V2.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
09
page
of 21
5. Installation instructions
Apply Zinc Coating to upper section
of C Post after ramming
1a. Before starting, check you have
the installation tools needed. Position
the required components close to the
installation location. Make sure that the
hydraulic pile driver equipment is suitable
for your particular installation.
Mark the line of the post array.
1b. Obtain the maximum allowed
distance between posts and the
minimum embedment length from the
relevant engineering certificate and/or
project drawing. If you don’t have this
document, please contact Clenergy
technical support.
Mark the positions of the posts using a
string and tape measure or GPS and
drive the posts into the ground. Use a
sting or a laser tool to make sure all posts
are in line and set to the correct height
according to the drawing.
Notes: apply zinc coating to upper
section (circled) of C-Post after piling to
repair any damage to the galvanisation
caused by ramming.
5.1 C-Post Installation
Installation Instruction