3
CLEARSPAN
™
CEDAR GREENHOUSES
Revision date: 06.16.09
REQUIRED TOOLS
The following list identifies the main tools needed to
assemble the greenhouse. Additional tools and supports
may be needed.
Transit or laser level for site layout
•
String line and tape measure
•
Marker, carpenter's level, and shovel
•
Variable speed drill and impact driver (cordless with
•
extra batteries works best)
Wrenches or ratchet and impact socket set
•
(recommended)
Drill and bits
•
Hammers, gloves, and eye protection
•
Ladders, work platforms, and other machinery for lifting
•
designed to work safely at the height of the greenhouse
UNPACK AND IDENTIFY PARTS
The following steps will ensure that you have all the
necessary parts
before
you begin to assemble the
greenhouse.
Unpack the contents of the shipment and place where
1.
you can easily inventory the parts. Refer to the Bill of
Materials/Spec Sheets.
Verify that all parts listed on the Bill of Materials/Spec
2.
Sheets are present. If anything is missing or you have
questions, consult the Pictorial Parts Guide and all
shelter diagrams throughout these instructions for
clarification, or contact Customer Service.
At this time, you do not need to open the plastic
bags containing the fasteners (if used).
ATTENTION:
To prevent splitting, drill and countersink
all mounting holes in greenhouse panels and other cedar
components.
Failing to drill and countersink the holes may split the
cedar when mounting screws are tightened.
ASSEMBLE AND ANCHOR THE BASE
For concrete surfaces, anchor the frame using customer-
supplied brackets and wedge anchors. Consult the
services of a qualified contractor for additional information
and details.
Measure all lengths of plastic lumber and match them to
the lumber lengths shown in the chart found below the
base diagrams in the Quick Start section.
ASSEMBLY PROCEDURE
Following the instructions as presented will help ensure
the proper assembly of your greenhouse. Failing to follow
these steps may result in an improperly assembled and
anchored greenhouse and will void all warranty and
protection to which the owner is entitled.
The steps outlining the assembly process are as follows:
Verify that all parts are included in the shipment. Notify
1.
Customer Service for questions or concerns.
Read these instructions, the Must Read document, and
2.
all additional documentation included with the shipment
before
you begin assembling the shelter.
Gather the tools, bracing, ladders (and lifts), and
3.
assistants needed to assemble the greenhouse.
Check the weather
4.
before
you install any panels. Do
not install panels on a windy or stormy day.
Re-evaluate the location and site based on the
5.
information and precautions presented in the
documentation included with the shipment.
Lay out the site (if this has not been completed).
6.
Assemble the base frame and
7.
anchor to the site
.
NOTE: Do not assemble the greenhouse on a
base frame that has not been anchored to the site.
Consult the anchoring diagram near the back of these
instructions and the Must Read document for anchoring
comments and instructions.
Assemble the greenhouse components in the order
8.
they are presented
Read the care and maintenance information at the end
9.
of these instructions.
Complete and return all warranty information as
10.
instructed.