![ClearSpan 104895 Manual Download Page 16](http://html.mh-extra.com/html/clearspan/104895/104895_manual_2621741016.webp)
CLEARSPAN
™
CEDAR GREENHOUSES
16
Revision date: 06.16.09
11
INSTALL DOOR PANELS
Gather the parts:
Door panels (#CG12119A & #CG12119B)
•
All door accessories
•
1-1/8" construction screws (#FAS8)
•
1-1/2" Phillips head screws (#FAF28P)
•
Use the diagrams to install the door panels.
Locate the lower door panel and position it in
1.
the door opening of the frame. Verify that the
side with the 90° connectors is to the
inside
of the shelter.
NOTE:
The door panels can be positioned to swing open from the left or the right. Remove and reattach
hinges as needed.
With the panel in the opening, attach the hinges to the doorjamb using FAS8 square head screws.
2.
Locate the remaining upper door panel, position the panel in the door opening, and attach the hinges as
3.
described in the previous step.
ATTENTION:
To ensure proper door operation, maintain a 1/4" gap between the upper and lower panels.
With both door panels secured in place, close each panel and attach door handles, door lock, and 2"
4.
turn button in the desired location using FAF28P Phillips head screws.
ATTENTION:
Attach the locking hardware and turn button to the
bottom panel
.
Upper Door Panel
CG12119A
Lower Door Panel
CG12119B
NOTE:
Door handles can be
attached as desired.
NOTE:
Maintain an even gap of
approximately 1/4" across the
bottom of the door and between
door panels.
FAS8
screws
2
FAF28P
screws
4
Frame length of your
building may differ
from what is shown.