![ClearSpan 104895 Manual Download Page 12](http://html.mh-extra.com/html/clearspan/104895/104895_manual_2621741012.webp)
CLEARSPAN
™
CEDAR GREENHOUSES
12
Revision date: 06.16.09
8
INSTALL RAKE BOARDS (2 FRONT)
Locate one (1) rake board (#CG72133) and attach it to the top of the
1.
front end wall
as shown below.
Secure using three (3) evenly spaced 2-1/2" construction screws (#FAS13).
NOTE: Drill and countersink mounting holes in rake boards to prevent splitting.
Locate another rake board (#CG72133) and attach to the remaining side of the
2.
front end wall
as
described in the previous step.
NOTE:
Verify that the angled edges of the rake board align with the peak of the end wall.
1
FAS13
construction
screw
CG72133
View as
seen from
the inside.
2
FAS13
construction
screw
CG72133
View as
seen from
the inside.
Step 2
Step 1
Frame length of your
building may differ
from what is shown.