Operator's Manual: Models CB-1500 & CB-2500 (230 V / 50 Hz)
5-1
SECTION 5: METERING PUMP PRIMING
Understanding Metering Pump Priming
Preparing your Clean Burn furnace for operation begins with priming the metering pump. The
procedures in this section must be performed in sequence
without interruption
to properly prime the
pump.
Required Tools and Materials
The following tools and materials are required for oil pump priming and should be gathered before
starting any procedures:
•
3/8" open-end wrench
•
5/8" open-end wrench
•
Rags
•
Two containers (minimum one-gallon)
•
Permatex #2 non-hardening gasket sealer
•
Adjustable Wrench
•
Pipe Wrench
Summary of Contents for CB-500 series
Page 2: ......
Page 4: ......
Page 18: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 1 10 ...
Page 60: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 4 26 ...
Page 66: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 5 6 ...
Page 74: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 7 4 ...
Page 96: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 10 8 ...
Page 114: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz A 18 ...
Page 122: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz D 2 ...