Operator's Manual: Models CB-1500 & CB-2500 (230 V / 50 Hz)
3-2
Figure 3A - Overview of 2500 Furnace Assembly (CB-1500 is similar)
Complete assembly of the CB-1500/CB-2500 furnace according to the following list of activities as
illustrated above:
(1) Installing the Blower Assembly
(2) Installing the Hot Air Discharge Components
(3) Installing the Energy Retention Disc
(4) Installing the Burner
(5) Installing the Connector Block, Oil Line Tubing, and Air Line Tubing
NOTE:
Corresponding procedures provided in order in this section.
2
3
4
5
ENERGY
DISC HOOKS OVER MOUNTING
NOTE: LOOP ON ENERGY RETENTION
BRACKET ON BACK WALL OF
COMBUSTION CHAMBER
1
HOT AIR DISCHARGE
FURNACE BREECH
BURNER
MOUNTING
BRACKET
BURNER
CABLE
FURNACE DOOR
FURNACE
R.H.
BREECH
THROAT
LH FURNACE
BREECH WITH
CLEAN−OUT
"ALL THREAD" RODS
COUPLINGS FOR "ALL THREAD" RODS
CHAMBER
COMBUSTION
BACK WALL OF
I88943
RETENTION DISC
INSTALLED ON
NOTICE THE VARIOUS MOUNTING CHOICES FOR THE LOUVERS
IT IS OK TO OPEN OR RESTRICT THE LOUVERS AS NEEDED, AND THEN
TO TURN THOSE CONFIGURATIONS IN ANY OF FOUR DIRECTIONS
JUNCTION BOX
220-2 40V 5 0-60Hz 3W
Nr. 05 7H7036
Type BHO 64
Danfoss
ts 10s
AIR OIL
Summary of Contents for CB-500 series
Page 2: ......
Page 4: ......
Page 18: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 1 10 ...
Page 60: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 4 26 ...
Page 66: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 5 6 ...
Page 74: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 7 4 ...
Page 96: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 10 8 ...
Page 114: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz A 18 ...
Page 122: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz D 2 ...