Operator's Manual: Models CB-1500 & CB-2500 (230 V / 50 Hz)
3-1
SECTION 3: FURNACE ASSEMBLY
Understanding Assembly
Assembling your Clean Burn Furnace includes the following steps:
(1) Installing the Blower Assembly
(2) Installing the Hot Air Discharge Components
(3) Installing the Energy Retention Disc
(4) Installing the Burner
(5) Installing the Connector Block, Oil Line Tubing, and Air Line Tubing
Clean Burn recommends that you review all assembly procedures before proceeding, paying careful
attention to safety information statements.
Figure 3A
on the following page provides a general overview of the furnace components and their
proper assembly.
Required Tools and Materials
The following tools are required for furnace assembly and should be gathered before starting any procedures:
•
3/8" open-end wrench
•
9/16" open-end wrench
•
Medium flat-blade screwdriver
•
Medium adjustable wrench
•
1/4" nut driver attachment for drill
•
Variable speed drill
Summary of Contents for CB-500 series
Page 2: ......
Page 4: ......
Page 18: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 1 10 ...
Page 60: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 4 26 ...
Page 66: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 5 6 ...
Page 74: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 7 4 ...
Page 96: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz 10 8 ...
Page 114: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz A 18 ...
Page 122: ...Operator s Manual Models CB 1500 CB 2500 230 V 50 Hz D 2 ...