31
E
IN FIELD OPERATION
OPERATORS MANUAL - HYBRID MOUNTED
3
Hang scales from an appropriate
place. Hang bucket or suitable
container from scales and
ZERO
.
4
Hold the bucket under the open
venturi and then press and hold
the calibration button for three
seconds and then let go. The
metering unit will continue to
turn dispensing seed. After an
appropriate amount of seed has
been dispensed press and hold
the button once more for three
seconds to stop the metering unit.
Note: It is important to press
and hold the button for three
seconds each time it is used
to prevent miss starts / stop
resulting in false readings
Summary of Contents for HYBRID MOUNTED
Page 4: ...4 OPERATORS MANUAL HYBRID MOUNTED ...
Page 6: ...A INTRODUCTION 6 OPERATORS MANUAL HYBRID MOUNTED ...
Page 12: ...C DIRECTIVE PROVISIONS 12 OPERATORS MANUAL HYBRID MOUNTED ...
Page 34: ...E IN FIELD OPERATION 34 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 3M ...
Page 35: ...35 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4M ...
Page 36: ...E IN FIELD OPERATION 36 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4 8M ...
Page 37: ...37 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 6M ...
Page 45: ...45 G DECLARATION OF CONFORMITY OPERATORS MANUAL HYBRID MOUNTED ...
Page 49: ......
Page 51: ......