D
PRE-WORK PREPARATION
18
OPERATORS MANUAL - HYBRID MOUNTED
Access to the hopper for loading seed and fert is by means of the ladder onto the hopper access platform.
Pre-work Preparation
ACCESSING THE HOPPER
Fold down the ladder as shown in the photos above.
Open the hopper cover as shown in the photos above.
OPENING THE HOPPER
ENSURE THE LADDER IS FOLDED UP WHEN THE DRILL IS WORKING
!
ENSURE THE HOPPER COVER IS CLOSED WHEN THE DRILL IS WORKING
!
Summary of Contents for HYBRID MOUNTED
Page 4: ...4 OPERATORS MANUAL HYBRID MOUNTED ...
Page 6: ...A INTRODUCTION 6 OPERATORS MANUAL HYBRID MOUNTED ...
Page 12: ...C DIRECTIVE PROVISIONS 12 OPERATORS MANUAL HYBRID MOUNTED ...
Page 34: ...E IN FIELD OPERATION 34 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 3M ...
Page 35: ...35 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4M ...
Page 36: ...E IN FIELD OPERATION 36 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4 8M ...
Page 37: ...37 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 6M ...
Page 45: ...45 G DECLARATION OF CONFORMITY OPERATORS MANUAL HYBRID MOUNTED ...
Page 49: ......
Page 51: ......