D
PRE-WORK PREPARATION
14
OPERATORS MANUAL - HYBRID MOUNTED
On taking delivery of your drill please check for any possible damage that could have occurred during
delivery. Remove any additional parts (harrow tines, level boards etc.) that may have been stored in the
seed hopper for transit.
A tool box is supplied and contains the following items:
1 x Quick Release Tool
1 x Spare Front Tine (Part No SBA152)
1 x Pack of Shear Bolts (Shear Bolt version machines only)
2 x M16 U-Bolts for Tine
1x Control Unit and Cable
1 x Control Unit Mounting Bracket and Bolts
1 x Tractor Power Cable
1 x Claydon Instruction Manual
1 x Claydon Instruction DVD
1 x Parts Catalogue
1 x Calibration Tongs
1 x Calibration Scales
1 x RDS Operation manual
1 x Fan 1” ISO with 18L male thread
(Please contact your supplier if any are missing.)
Introduction
Summary of Contents for HYBRID MOUNTED
Page 4: ...4 OPERATORS MANUAL HYBRID MOUNTED ...
Page 6: ...A INTRODUCTION 6 OPERATORS MANUAL HYBRID MOUNTED ...
Page 12: ...C DIRECTIVE PROVISIONS 12 OPERATORS MANUAL HYBRID MOUNTED ...
Page 34: ...E IN FIELD OPERATION 34 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 3M ...
Page 35: ...35 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4M ...
Page 36: ...E IN FIELD OPERATION 36 OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 4 8M ...
Page 37: ...37 E IN FIELD OPERATION OPERATORS MANUAL HYBRID MOUNTED Seed Rate Calibration Chart 6M ...
Page 45: ...45 G DECLARATION OF CONFORMITY OPERATORS MANUAL HYBRID MOUNTED ...
Page 49: ......
Page 51: ......