9-13
Cisco ONS 15327 User Documentation, R3.3
June 2002
Chapter 9 Ethernet Operation
Ethernet Circuit Configurations
Figure 9-13 Viewing a span
Step 30
Verify that the new circuit is correctly configured.
Note
If the circuit information is not correct, click the
Back
button and repeat the procedure with the
correct information. You can also click
Finish
, delete the completed circuit, and begin the
procedure again.
Step 31
Click
Finish
.
Step 32
You now need to provision the Ethernet ports and assign ports to VLANs. For port provisioning
instructions, see the
“Provision E10/100-4 Ethernet Ports” procedure on page 9-3
. For instructions about
assigning ports to VLANs, see the
“Provision Ethernet Ports for VLAN Membership” procedure on
9.4.3 Hub and Spoke Ethernet Circuit Provisioning
This section provides steps for creating a hub and spoke Ethernet circuit configuration. The hub and
spoke configuration connects point-to-point circuits (the spokes) to an aggregation point (the hub). In
many cases, the hub links to a high-speed connection and the spokes are Ethernet cards.
illustrates a sample hub and spoke ring. Your network architecture may differ from the example.
Summary of Contents for ONS 15327
Page 22: ...Contents xxii Cisco ONS 15327 User Documentation June 2002 I N D E X ...
Page 30: ...Figures xxviii Cisco ONS 15327 User Documentation June 2002 ...
Page 44: ...Procedures xlii Cisco ONS 15454 Installation and Operations Guide R3 2 June 2002 ...
Page 540: ...Glossary GL 16 Cisco ONS 15327 User Documentation R3 3 June 2002 ...