1-5
Cisco LRE CPE Hardware Installation Guide
78-11469-04
Chapter 1 Overview
Front-Panel Description
For more information about installing a Catalyst LRE switch, refer to the switch
hardware installation guide.
Front-Panel Description
Each Cisco LRE CPE has a READY LED and a POWER LED. The
Cisco 575 LRE CPE and Cisco 576 LRE 997 CPE also have an ACT LED and an
ETH LED. The Cisco 585 LRE CPE also has four LEDs, labeled ETH1 through
ETH4.
Figure 1-3
to
Figure 1-5
show the front panels of the CPEs.
Table 1-2
and
Table 1-3
list the front-panel LEDs and their meanings.
Figure 1-3
Front Panel of the Cisco 575 LRE CPE
Cisco 575 LRE
ACT
READ
Y
PO
WER
ETH
45066