Chapter 2 Installation
Installing the CPE
2-18
Cisco LRE CPE Hardware Installation Guide
78-11469-04
Installing the CPE on a Wall
Tip
We recommend that you attach the Ethernet, telephone, and power cables to the
CPE before mounting it on wall because the connectors might be hidden from
view after the CPE is installed. For more information, see the connection
procedures beginning with the
“Connecting to a 10/100 Port” section on
page 2-21
.
Step 1
Locate the screw template. The template is used to align the mounting screw
holes.
Note
The template has adhesive to hold it in place while you drill holes in the
wall. If you have purchased a 6- or 24-multipack, you will be using the
same screw template to install each CPE. Do not use the adhesive.
Instead, hold the template against the wall while you drill the screw holes
and insert the screws.
Step 2
Position the screw template so that the cable lock hole is facing toward the floor.
(See
Figure 2-5
.) This ensures that the cables will face toward the floor after they
are connected.
Note
Do not attach the screw template to the wall yet.