Chapter 2
Installation Procedures
Set Up the Hardware Environment
2-4
Cisco 600 Series Installation and Operation Guide
78-11190-01
Note
Electrical equipment generates heat. Ambient air temperature might
not be adequate to cool equipment to acceptable operating
temperatures without adequate circulation. Ensure that the room in
which you operate the CPE has adequate air circulation.
Be careful not to block the air vents on the CPE.
Connect the Management Port to the PC’s COM Port
Step 1
Connect the RJ-45 connector on the management cable to the MGMT port on the
CPE.
Step 2
Connect the other end of the management cable to the computer’s COM port. If
your computer is equipped only with a DB-25 serial port, you need a
DB-9-male-to-DB-25-female adapter.
Figure 2-2
Cisco 600 series CPE Management Port Cabling
35377
110
Cisco 6xx
PWR
WALL
MGMT