
1-3
Cisco Wide Area Virtualization Engine 594 and 694 Hardware Installation Guide
OL-24619-02
Chapter 1 Introducing the Cisco Wide Area Virtualization Engine 594 and 694
Hardware Features
Figure 1-2
shows the front panel LEDs.
Figure 1-2
Front Panel LEDs
Table 1-1
describes the front panel LEDs and their functions.
246570
1
2
3
4
5
6
9
7
8
Cisco Wide Area Virtualization Engine 594
Table 1-1
Front Panel LEDs
LED
Color
State
Description
1,3
Drive activity LED
Green
Blinking
Drive activity is normal.
Green
On
Online.
Green
Blinking
1Hz
Drive locate.
—
Off
No reading/writing, no activity.
5
NIC link/activity
Green
On
Link exists.
Green
Blinking
Activity exists.
—
Off
No link detected.
6
NIC speed
—
Off
10Mbps connection.
Green
On
100Mbps connection.
Yellow
On
1000Mbps connection.
7
System power LED
Green
On
System is on.
—
Off
Power cord is not attached or power supply
failure has occurred.
8
System fault LED
Yellow
On
System has detected a fault. Refer to the
“Troubleshooting the System Hardware”
chapter for more information.
—
Off
System operation is normal.
9
Storage activity LED
Green
Blinking
Drive activity is normal.
Orange
On
Drive failure has occurred.