2.5.2 Install 1 RU Distribution Shelf Load Connections
Figure 2-23
Installing GMT Cabling
Step 4
Connect cables to equipment that requires the supplied DC Power per that equipment’s specifications.
Step 5
Install fuses by sliding them into the appropriate slot (
Figure 2-24
).
Figure 2-24
Installing Fuses
Note
An empty space should be left on each side of any 15A GMT fuse used for thermal considerations.
2.5.2 Install 1 RU Distribution Shelf Load Connections
The following section is for systems that use the 1 RU Distribution Shelf. For systems without the 1 RU
Distribution Shelf, go to
Chapter 4, “System Operation.”
124771
Blank
15A Fuse
Blank
Summary of Contents for 124778
Page 6: ...Contents vi Cisco AC DC Power System User Guide R1 0 May 2006 ...
Page 10: ...Tables x Cisco AC DC Power System User Guide R1 0 May 2006 ...
Page 76: ...5 4 Cisco AC DC Power System User Guide R1 0 May 2006 Chapter 5 System Troubleshooting ...
Page 78: ...6 2 Cisco AC DC Power System User Guide R1 0 May 2006 Chapter 6 System Parts List ...
Page 86: ...A 8 Cisco AC DC Power System User Guide R1 0 May 2006 Appendix A Translated Safety Warnings ...
Page 96: ...A 18 Cisco AC DC Power System User Guide R1 0 May 2006 Appendix A Translated Safety Warnings ...