2-24
Cisco AC/DC Power System User Guide, R1.0
May 2006
Chapter 2 System Installation
2.5 Install Load-and-Return Connections
Figure 2-21
Alarm Board Connection Points
Step 7
Reinsert the terminal block (
Figure 2-20
#3).
Step 8
Alarm cables run from the rear of the system shelf (leaving enough of a service loop to allow the drawer
to slide out) through the access window (between the controller drawer and the GMT drawer area)
(
Figure 2-20
).
Step 9
Secure the alarm cables using the provided strain relief tie-offs to aid in cable management.
2.5 Install Load-and-Return Connections
The following section contains information on installing different distribution options available for the
power system.
Table 2-7
provides a list of recommended wire gauges for both the GMT fuse panel and
the 1 RU Distribution Shelf.
124764
Table 2-7
Recommended Wire Sizes
Wire Gauge Stranded
Applications
10 to 8 AWG
(6mm² to 10mm²)
Breaker Load
(up to 30A)
22 AWG (0.34mm²)
2A GMT Fuses
18 AWG (0.75mm²)
5A GMT Fuses
Summary of Contents for 124778
Page 6: ...Contents vi Cisco AC DC Power System User Guide R1 0 May 2006 ...
Page 10: ...Tables x Cisco AC DC Power System User Guide R1 0 May 2006 ...
Page 76: ...5 4 Cisco AC DC Power System User Guide R1 0 May 2006 Chapter 5 System Troubleshooting ...
Page 78: ...6 2 Cisco AC DC Power System User Guide R1 0 May 2006 Chapter 6 System Parts List ...
Page 86: ...A 8 Cisco AC DC Power System User Guide R1 0 May 2006 Appendix A Translated Safety Warnings ...
Page 96: ...A 18 Cisco AC DC Power System User Guide R1 0 May 2006 Appendix A Translated Safety Warnings ...