
ORIENTATIONAL FOUNDATIONS FOR RAPTION
TYPE OF TERRAIN
Ck
(kg/cm
2
)
FOUNDATION SIZE
(Az x Bz Hz) cm
COMMENTS
SOFT
5
110 x 60 x 65
For example vegetal not compact terrain
COMPACT
12
110 x 55 x 55
For example mix vegetable land with
engraved compactors
VERY COMPACT
20
110 x 55 x 50
For example mix sand ground with very
compacted and paved gravel asphalt
VERY COMPACT AND CONCRETE
SLAB
20
110 x 45 x 45
Minimum slab edge 10cm of concrete
HM - 100
FOUNDATION MEASUREMENTS
23
Installation Guide
Raption
Summary of Contents for Raption 100
Page 1: ...Raption Series INSTALLATION GUIDE M186A01 03 21D...
Page 2: ...2 Raption Installation Guide...
Page 15: ...15 Installation Guide Raption...
Page 16: ...3 A Dimensions Units specified in millimeters 16 Raption Installation Guide...
Page 56: ...56 Raption Installation Guide...
Page 58: ...58 Raption Installation Guide...
Page 59: ...59 Installation Guide Raption...