• Once the kit is assembled, it must be placed in the ground. If the Charge Point has to be
installed outside and there is no limitation of depth, is recommended to make a concrete
base.
• The concrete base shall provide the passage of power cables, it must be done by corrugated
tube placed inside the foundation through the mounting template, as it can be seen below.
Before fixing the template inside of the concrete basement make
sure front mark must face with the front side of the charger
43,5
16
23,5
21
Installation Guide
Raption
Summary of Contents for Raption 100
Page 1: ...Raption Series INSTALLATION GUIDE M186A01 03 21D...
Page 2: ...2 Raption Installation Guide...
Page 15: ...15 Installation Guide Raption...
Page 16: ...3 A Dimensions Units specified in millimeters 16 Raption Installation Guide...
Page 56: ...56 Raption Installation Guide...
Page 58: ...58 Raption Installation Guide...
Page 59: ...59 Installation Guide Raption...