4
A
Minimum distances
When installing the Charge point, respect the minimum distances space for maintenance
and safety reasons.
Please comply accordingly to your country specifications.
The next picture shows how it should be installed.
• Do not install near areas where water or fluids can penetrate into the unit.
• Do not install the unit on unstable terrain.
(2)
Respects the minimum lateral distance to allow proper circulation of air flow. This unit has forced
ventilation.
(3)
If Bollard Impact Protector is installed, keep
600 mm
as a minimum distance in order to give enough
space to open the frontal door of the Charge point for maintenance tasks.
18
Raption
Installation Guide
Summary of Contents for Raption 100
Page 1: ...Raption Series INSTALLATION GUIDE M186A01 03 21D...
Page 2: ...2 Raption Installation Guide...
Page 15: ...15 Installation Guide Raption...
Page 16: ...3 A Dimensions Units specified in millimeters 16 Raption Installation Guide...
Page 56: ...56 Raption Installation Guide...
Page 58: ...58 Raption Installation Guide...
Page 59: ...59 Installation Guide Raption...