
1 — S U P P LY
All the units pass their correspondent quality test and are properly packaged for safe
transportation ensuring thus their correct operation. The proper transport of the unit is
responsibility of the freight forwarder.
Upon receipt of the Charge point make a careful inspection to verify that there is no
shipping damage.
Note:
If any damage caused by the forwarder is not indicated in the delivery note
during the receipt of Charge point,
CIRCUTOR
will not be held responsible for the cost
of repair/replacement.
You must find inside on the box, the foundation kit, the decorative front and rear
panels and two cardboard box, one of then with the connectors inside and the other
with the rest of material, such as keys, identification cards, installation manual, etc.
E
Supply and storage
12
Raption
Installation Guide
Summary of Contents for Raption 100
Page 1: ...Raption Series INSTALLATION GUIDE M186A01 03 21D...
Page 2: ...2 Raption Installation Guide...
Page 15: ...15 Installation Guide Raption...
Page 16: ...3 A Dimensions Units specified in millimeters 16 Raption Installation Guide...
Page 56: ...56 Raption Installation Guide...
Page 58: ...58 Raption Installation Guide...
Page 59: ...59 Installation Guide Raption...