-----
CVM-BDM supply network analyzer
-------- --- Page Nº 3
1.- BASIC INSTRUCTIONS
1.1.- Delivery spot check
This manual is issued to help all the CVM-BDM users to install and use it in
order to get the best from it. After receiving the unit please check the following points:
(a) Does this device corresponds to your order specifications?
(b) Check if any damage was done during the shipment process.
(c) Verify that it includes *One instruction manual .
(d) CD with PC software (Power-Vision).
1.2.- Connection procedures
The manual you hold in your hands contains information and
warnings about the
CVM-BDM
that the user should respect in order
to guarantee a proper operation of all the instrument functions and
keep its safety conditions.
Before connecting the instrument to the mains verify the following:
(a)
Power supply :
230 V a.c.
Power supply Va.c. ( Single phase ) 50 ... 60 Hz
(b) Maximum measuring voltage:
Standard: 500 V a.c. phase-neutral / 866 V a.c. between phases
A special model for 110 V measuring is available:
100 V a.c. phase-neutral / 173 V a.c. between phases
(c) Maximum measuring current: Transformer of In / 5 A a.c.