- 6 -
Operating Sequence
Diesel Units
NOTE: This step by step procedure is only an outline. Refer to the page(s) indicated
for complete instructions.
PROCEDURE:
PAGE
1)
Refer to fuel system air bleeding before starting.
12
2)
Start engine per engine operating instructions.
14
3)
Set temperature controller(s).
16
4)
Make sure tank outlet, sealing hose, and air cleanout valves are closed.
10-11
5)
Open Thermal Regulating Gate if cabinet heating is required.
18
6)
Ignite burner.
16
7)
Allow oil temperature to reach approximately 250º F.
8)
Regulate cabinet temperature.
18
9)
Start agitation.
20
10)
Add material, typically 2-3 biscuits if tank is empty.
20
11)
Allow for sufficient melting.
21
12)
Start material pump.
21
13)
Close Thermal Regulating Gate.
18
14)
Attach sealing wand extension and adjust flow.
21-22
15)
Begin sealing procedure.
21-22
16)
10-15 minutes before the end of the work day, return temperature
25
control knobs to zero.
17)
Clean out Melter.
25-27
Summary of Contents for MAGMA 110
Page 48: ... 48 Wiring Diagrams Refer to Individual Wiring Diagrams for Details ...
Page 49: ... 49 Wiring Diagrams Trailer Wiring Diagram ...
Page 50: ... 50 Engine and Burner Wiring Harness Wiring Diagrams ...
Page 51: ... 51 Wiring Diagrams Relay Panel ...
Page 52: ... 52 Wiring Diagrams Temperature Control Wiring Diagram ...
Page 53: ... 53 Wiring Diagrams Primary Control ...
Page 54: ... 54 Wiring Diagrams LOFA Engine Shutdown Heated Hose Generator ...
Page 59: ... 59 Plumbing System Parts List Dual Wand Single Wand ...
Page 75: ... 75 11 12 Miscellaneous Parts ...
Page 77: ... 77 ...
Page 78: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...