- 13
-
Bottle Hookup and Ignition (LP Units only)
NOTE: Liquid withdrawal requires optional hose adapters and engine vaporizer
(Diagram 4).
1)
Place 100 lb. propane bottle(s) in rack and secure in place with chain binder(s).
2)
Connect hoses (A) to bottle(s).
NOTE: POL fittings are left hand thread. All connections must be air tight.
3)
Close hand torch supply valve (B). (optional)
4)
On models with optional two bottles, open the valve (C) from one bottle or the other.
5)
Open valve on LP bottle and set regulator (D) at 13 to 14 PSI.
WARNING: DO NOT exceed 14 PSI.
6)
Set the oil controller (E) to 550º F (Diagram 5).
DO NOT
exceed 550º F. Set the
material controller (F) to the recommended material working temperature (typically
listed on can or box). (optional)
7)
Turn the rocker switch (G) on. The light in the switch will indicate that the control system
is on.
NOTE: If the burner does not ignite within 8-10 seconds, the unit will require reset-
ting. Turn switch "off", allow time for the unburned fuel to exit the chamber
and repeat procedure.
8)
If ignition does not occur, check the fuse and gas supply.
B
A
C
D
C
A
E
F
G
Diagram 4
Diagram 5
Summary of Contents for MAGMA 110
Page 48: ... 48 Wiring Diagrams Refer to Individual Wiring Diagrams for Details ...
Page 49: ... 49 Wiring Diagrams Trailer Wiring Diagram ...
Page 50: ... 50 Engine and Burner Wiring Harness Wiring Diagrams ...
Page 51: ... 51 Wiring Diagrams Relay Panel ...
Page 52: ... 52 Wiring Diagrams Temperature Control Wiring Diagram ...
Page 53: ... 53 Wiring Diagrams Primary Control ...
Page 54: ... 54 Wiring Diagrams LOFA Engine Shutdown Heated Hose Generator ...
Page 59: ... 59 Plumbing System Parts List Dual Wand Single Wand ...
Page 75: ... 75 11 12 Miscellaneous Parts ...
Page 77: ... 77 ...
Page 78: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...