Section 4: Parts and Module Replacement
J Series 2.0, 2.4, and 3.0kW Service Manual
4-25
020-100739-01 Rev. 1 (01-2012)
8. Remove the 6 screws securing the red (P84), green (P85), and blue (P86) satellite cable connections to the
panel driver.
9. Remove the 3 screws securing the light engine base plate to the optical assembly.
10. Disconnect the liquid cooling hoses.
11. Lift the light engine out of the projector, and place it onto a optical assembly base.
NOTE:
Do not touch
the glass surface.
12. Install the light engine.
NOTE:
The light engine may require adjustment to boresight alignment
(
Boresight
Alignment
),
fold mirror adjustment
(
Fold Mirror Adjustment
),
and integrator adjustment
(
Integrator
Assembly Adjustment
).
4.5.19 Remove and Replace the Feet
1. Power down the projector:
a. Turn the projector off and allow the projector to cool for a minimum of 5 minutes.
b. Disconnect the AC power cord from the rear of the projector.
2. Access the front feet, remove the front cover:
a. If installed, remove the projection lens. See
Remove the Lens
.
b. Remove the 6 screws holding the lens mount dust boot.
c. Remove the 6 quick-release screws holding the front cover and then remove it and set it aside.
NOTE:
The dust boot stays attached to the front skin.
3. Access the rear feet, remove the lens side cover or non-lens side cover:
a. Loosen the 6 quick-release screws.
b. Remove the cover and set it aside.
c. Place the projector on its side to access the feet.
Summary of Contents for J 2.0kW
Page 1: ...J Series 2 0 2 4 and 3 0kW S e r v i c e M a n u a l 020 100739 01 ...
Page 2: ......
Page 3: ...J Series 2 0 2 4 and 3 0kW S e r v i c e M a n u a l 020 100739 01 ...
Page 12: ......
Page 16: ......
Page 70: ......
Page 72: ......
Page 74: ......
Page 88: ......
Page 92: ......
Page 93: ......