Section 4: Parts and Module Replacement
J Series 2.0, 2.4, and 3.0kW Service Manual
4-41
020-100739-01 Rev. 1 (01-2012)
7. Open the 4 retaining clips to release the CLB PC board.
8. Remove the CLB PC board.
9. Install the new CLB PC board.
4.5.35 Remove and Replace the AC Relay Module
1. Power down the projector:
a. Turn the projector off and allow the projector to cool for a minimum of 5 minutes.
b. Disconnect the AC power cord from the rear of the projector.
2. Remove the non-lens side cover:
a. Loosen the 6 quick-release screws.
b. Remove the cover and set it aside.
3. Remove the nut and washer from the starter capacitor.
4. Disconnect the P59 and P60 connectors from the AC relay module.
5. Remove the 4 screws securing the AC relay.
6. Remove the AC relay module.
7. Install the new AC relay module.
Summary of Contents for J 2.0kW
Page 1: ...J Series 2 0 2 4 and 3 0kW S e r v i c e M a n u a l 020 100739 01 ...
Page 2: ......
Page 3: ...J Series 2 0 2 4 and 3 0kW S e r v i c e M a n u a l 020 100739 01 ...
Page 12: ......
Page 16: ......
Page 70: ......
Page 72: ......
Page 74: ......
Page 88: ......
Page 92: ......
Page 93: ......