NEXGEN60 InstallationRev1
Page
8
of
42
04/11/2022
SECTION 2
INSTALLATION
2.1 UNPACKING
Units are shipped from the factory. In the event of damages during shipping, it is the
responsibility of the customer to notify the carrier immediately and to file a damage claim.
Open the crate carefully and examine all material inside.
2.2 STORAGE
When storing units, use the original packaging and store under a shelter to protect the
contents from weather.
2.3 SAFETY CONSIDERATIONS
IMPORTANT SAFETY INSTRUCTIONS
READ AND FOLLOW ALL INSTRUCTIONS
SAVE THESE INSTRUCTIONS
WHEN INSTALLING, OPERATING, AND MAINTAINING THIS EQUIPMENT, KEEP
SAFETY CONSIDERATIONS FOREMOST. USE PROPER TOOLS, PROTECTIVE
CLOTHING, AND EYE PROTECTION WHEN WORKING ON OR INSTALLING THE
EQUIPMENT. FOLLOW THE INSTRUCTIONS IN THIS MANUAL AND TAKE ANY
ADDITIONAL SAFETY MEASURES APPROPRIATE. BE EXTREMELY CAREFUL IN
THE PRESENCE OF HAZARDOUS SUBSTANCES.
THE PERSONNEL RESPONSIBLE FOR INSTALLATION, OPERATION, AND
MAINTENANCE OF THIS EQUIPMENT MUST BE FULLY FAMILIAR WITH THE
CONTENTS OF THIS MANUAL.
ANY SERVICING OF THIS EQUIPMENT MUST BE DONE WITH THE UNIT FULLY OFF
AND DISCONNECTED FROM THE POWER SOURCE AND ALL PRESSURE BLED
FROM THE LIQUID LINES.
WARNING
CHLORKING®
SYSTEMS ARE INTENDED TO BE INSTALLED ACCORDING
TO ALL LOCAL AND NATIONAL REGULATIONS.
CONNECT THE EQUIPMENT ASSEMBLY TO A CIRCUIT PROTECTED BY A
GROUND-FAULT CIRCUIT-INTERRUPTER.