![ChlorKing NEXGEN60 Installation, Operation And Maintenance Manual Download Page 34](http://html.mh-extra.com/html/chlorking/nexgen60/nexgen60_installation-operation-and-maintenance-manual_2602780034.webp)
NEXGEN60 InstallationRev1
Page
34
of
42
04/11/2022
STEP 10
– Open both Acid Wash Valves marked B on the Acid Wash assembly.
Press NEXT to continue.
STEP 11
– Close both Acid Wash Valves marked A on the Acid Wash assembly.
Press NEXT to continue.
Open Acid
Wash
Valve B
Open Acid
Wash
Valve B
Close Acid
Wash Valve A
Close Acid
Wash Valve A