NEXGEN60 InstallationRev1
Page
39
of
42
04/11/2022
STEP 21
– Adjust the Production Flow Valve marked 4 to the desired flow rate outlined
in Section 3.2 on page 19.
Press NEXT to continue.
STEP 22
– Cell cleaning is finished.
Press NEXT to continue.
Valve 4
Production
Flow Valve