NEXGEN60 InstallationRev1
Page
2
of
42
04/11/2022
TABLE OF CONTENTS
1.0 DESCRIPTION
3
1.1
General
Information 3
1.2
Principals
of
Operation
4
1.3 Specifications,
Certifications, and Sizing Guidelines
5
2.0 INSTALLATION
8
2.1
Unpacking
8
2.2
Storage
8
2.3
Safety
Considerations
8
2.4
Plan
Ahead
10
2.5
Additional Parts Required for
Installation
10
2.6
Power
Supply
Electrical
Connections
11
2.7
Bonding
12
2.8
Plumbing
Connections
13
2.9
Saturated
Salt
Feeder
Installation
16
2.10
Plumbing
the
Overflow
17
2.11 Preparing the pH Neutral System
18
2.12
Plumbing
the
Hydrogen
Vent
18
3.0 OPERATION
19
3.1
Start-up
Procedures
and
Checks 19
3.2
Adjusting
Chlorine
Output 19
3.3
Touch-screen
Icon
Explanations 20
3.4
Using
the
Touchscreen
21
4.0 MAINTENANCE
28
4.1
Routine
Maintenance
28
4.2
Cell
Cleaning
Procedure
28
5.0
WARRANTY
INFORMATION
42
Note: This manual is subject to change at any time based on system improvements,
design changes, authorized modifications, or new information. Please consult
ChlorKing for the latest revision.
Manufacturer:
ChlorKing Inc
2935 Northeast Parkway
Atlanta, GA 30360
1-800-536-8180