NEXGEN60 InstallationRev1
Page
16
of
42
04/11/2022
2.10 PLUMBING THE PRODUCTION TANK OVERFLOW
Install the overflow with the T provided in the installation kit. This T will remain open on
top to prevent syphoning in case of tank overflow. The bottom of the T receives a 1.5”
FPT low pressure connection with hose directed to a floor drain, drain tube is not
provided.