17
EZ LINER EXPRESS
USERS MANUAL
Figure 33
Figure 34
2. Push the Tower (using handles) so that the Tower Insert
Plug is inserted into and fully engages the Mounting Port.
To ensure full engagement, place the tower/mainframe
pin into the pinhole on the mainframe. The
tower/mainframe pin should proceed to fall completely
through the top and bottom surfaces of the mainframe and
completely through the pin hole in the Tower Insert Plug.
In other words, the tower/mainframe pin should stop when
the pin stop hits the top mainframe surface.
Remove the
tower/mainframe pin prior to pulling!
WARNING
Failure to completely engage
tower insert plug with the tower port on
the mainframe could cause injury and
damage to the tower or mainframe.
3. Pull the position pin on the Tower Arm and rotate the tower to achieve the desired pulling angle. Replace the position pin in the
Tower Arm once the desired pulling angle is achieved (see Figure 34).
Position Pin
Tower Arm
Tower Pipe
Remove The Tower/Mainframe Pin
Prior To Pulling
IMPORTANT
Tower/Mainframe Pin
M20 Tower Height
Adjustment Bolts
Remove
The Tower/Mainframe Pin
Prior To Pulling
IMPORTANT
Summary of Contents for EZ LINER EXPRESS
Page 1: ...2013 Vehicle Service Group USERS MANUAL EZ LINER EXPRESS ...
Page 30: ...NOTES ...
Page 31: ...NOTES ...