
CPS 750
48
1310 3012 02
CPS
4.4
Storage
Run the compressor regularly, e.g. twice a week, until warm.
Load and unload the compressor a few times to operate the unloading and regulating components. Close
the air outlet valves after stopping.
4.5
Preventive maintenance schedule for the compressor
The schedule contains a summary of the maintenance instructions. Read the respective section before
taking maintenance measures.
When servicing, replace all disengaged packings, e.g. gaskets, O-rings, washers.
For engine maintenance refer to Engine Operation Manual.
The maintenance schedule has to be seen as a guideline for compressors operating in a dusty
environment typical to compressor applications. Maintenance schedule can be adapted depending on
application, environment and quality of maintenance.
If the compressor is going to be stored without running from time to time, protective
measures must be taken.
Summary of Contents for CPS 750
Page 1: ...Instruction Manual for Portable Compressors English CPS 750 ...
Page 2: ......
Page 8: ...CPS 750 8 1310 3012 02 CPS ...
Page 86: ...CPS 750 86 1310 3012 02 CPS ...
Page 90: ...CPS 750 90 1310 3012 02 CPS 9 Dataplate ...
Page 92: ...CPS 750 92 1310 3012 02 CPS ...
Page 93: ......
Page 94: ...01 2009 1310 3012 02 ...