Intelect® Shortwave 400
37
OPErATiON
PuTTiNG ThE uNiT iNTO OPErATiON
Preparing the Unit for Operation
The unit has been completely assembled in the factory
and is ready for use except for connection of the
electrodes and the power cord.
Proceed as follows in order to prepare the unit for
operation:
• Make sure that the voltage rating on the serial decal
conforms to the system voltage of the building.
• Insert the required electrodes into the recesses at the
end of the electrode arms and fasten the electrodes
with the locking screws.
• Plug the electrode connection cable into the socket
on the back of the unit. Attach the connecting cable
in the cable holders on the electrode arms.
• Set the power switch to the off position.
• Plug the high-load connector (power cord) for
non-heating appliances into the corresponding
socket on the back of the unit.
•
Check the condition of the housing and the insulation
of the electrodes, electrode connection cable and the
power supply cable. Also make sure that the cables
have been routed correctly.
• Insert the power cord plug into an earthed socket
outlet.
Check for Operational Safety
Refer to
Safety Instructions, Personal Safety and
Contraindications
for operational safety information.
The unit and the electrodes must be positioned so that
there is no danger of personal injury. Therefore, you
must read and observe the safety instructions and the
list of contraindications before putting the unit into
operation.
Make certain that the unit is electrically earthed
by connecting only to a earthed electrical service
receptacle, conforming to the applicable national and
local electrical codes.
DANGER
WARNING