Requirements for Installation
Before the unit can be installed and put into operation,
certain requirements must be fulfilled in the building where
the unit is to be operated.
Requirements of the Installation Location
• By selecting a suitable location for setting up the unit or
by means of structural measures, contact during the
treatment by the personnel or the patient with
conductive materials that are earthed or have a high
capacity to earth must be prevented (e.g. heating pipes,
water faucets, metal chairs, metal beds or other earthed
devices).
• The unit must be set up so that the (normal) release of
electromagnetic radiation during operation does not
hinder the function of other devices or data media. The
minimum distance to other devices or their power
supplies or data transfer lines is 6 meters. Please note that
the radiation can easily pass walls, ceilings and floors.
• The room and the installation location must be large
enough so that the unit can be operated from the front
even if the electrodes are positioned inconveniently.
Transport of the Unit
Measures concerning the transport of the unit from the
manufacturer to the operator are based on the individual
circumstances and are defined in the general terms of
business.
In the event of subsequent transport of the unit, the dealer
or the operator is responsible for the unit and for compliance
with the safety and accident prevention regulations.
The unit must be installed so that there is no danger to
the patient, the operator or other persons. Therefore, you
must read the
Safety Instructions
and the following
information.
If the unit cannot be installed immediately after delivery,
the unit and its external components or accessory
elements must be stored in their original packaging in a
dry place.
Do not store or operate the unit in a dusty environment.