6
Installation
Steam Coil Tank Heat and Steam Booster Heater
NOTE:
Only qualified personnel should make dishwasher steam connections.
Connections must meet local plumbing and sanitary codes. Improper installation is not covered by the
dishwasher warranty.
Steam Requirements:
2A:
3/4" NPT hot water supply (140
˚
F/60
˚
C) at 68 GPH at 20 PSI flowing pressure.
3A:
1/2" NPT cold water tempering (85
˚
F/30
˚
C) max 25 PSI if equipped.
4A:
3/4" NPT final rinse hot water (180-195
˚
F/82-91
˚
C) at 324 GPH at 20 PSI flowing pressure.
5A:
2" O.D. drain hose connection.
5B:
3/4" NPT booster relief to open drain.
6A:
1" NPT Booster 50 Lb/Hr / Tank Heat 25 Lb/Hr consumption.
7-10 PSI, 11-14 PSI, 15-30 PSI flowing pressure.
7A:
3/4" NPT condensate return to boiler (no back-pressure).
1A
5A
5B
7A
2A
6A
2 HP
34"
27"
1'-1 14 "
2'-114"
CLEARANCE
FRONT VIEW
87"
DOOR
UP
43 4 "
12"
1'-4 3 4 "
10"
1'-4 5 8 "
12"
314" 105
8 "
13"
1'-23 4 "
20"
11"
1'-0 12 "
5'-7 12 "
The illustration below details a steam heated machine consisting of a tank heat steam coil and a mounted
steam booster for the final rinse. Contact the factory for steam injector tank heat details.
Summary of Contents for D-H1TCM5
Page 10: ...vi Blank Page This Page Intentionally Left Blank ...
Page 34: ...24 DHBT DH1T Panels 7 12 10 10 11 11 10 6 1 5 9 6 8 2 3 4 9 9 7 8 ...
Page 44: ...34 Wash and Rinse Spray Piping FRONT LEFT SIDE 2 1 2 3 7 6 8 7 13 10 8 5 4 5 3 11 10 9 12 ...
Page 48: ...38 Scrap Screens and Drain Assembly 2 3 4 4 5 6 7 10 11 11 13 15 16 14 12 8 8 9 1 17 ...
Page 72: ...62 Dish racks PRV 1 2 3 ...
Page 74: ...64 This Page Intentionally Left Blank Blank Page ...