CET Electric Technology
28
Hour ≤ 23 and 1 ≤ Day ≤ 28. For example, the value 1512 means that the Self-
Read will take place at 12:00pm on the 15th day of each month.
A 0xFFFF value will disable the Self-Read operation and replace it with manual
operation. A manual reset will cause the Max. Demand of
This Time
to be
transferred to the Max. Demand of
Last Time
and then reset.
Predicted Response
The Predicated Response shows the speed of the predicted demand output. A
value between 70 and 99 is recommended for a reasonably fast response. Specify
a higher value for higher sensitivity.
70 to 99
Default=70
Table 4-2 Setup Parameters for Demand
The PMC-690 provides the following Present Demand and Predicted Demand parameters:
Present
Demand
Ua/Ub/Uc
ULN avg
Uab/Ubc/Uca
ULL avg
Ia/Ib/Ic
I avg
I4
U4
kVA Total
kWa/kWb/kWc
Imp./Exp.
kW Total Imp./Exp.
kvara/kvarb/kvarc
Imp./Exp.
kvar Total
Imp./Exp.
kVAa/kVAb/kVAc
P.F.a/P.F.b/P.F.c
Total P.F.
Frequency
Ua/Ub/Uc
Deviation
Uab/Ubc/Uca
Deviation
Ua/Ub/Uc Over
Deviation
Uab/Ubc/Uca Over
Deviation
Ua/Ub/Uc Under
Deviation
Uab/Ubc/Uca
Under Deviation
Freq Deviation
U2/U0 Unbalance
I2/I0 Unbalance
Ia/Ib/Ic K Factor
I4 K Factor
Ia/Ib/Ic THD
Ua/Uab THD
Ub/Ubc THD
Uc/Uca THD
U4 THD
I4 THD
Ua/Uab TOHD
Ub/Ubc TOHD
Uc/Uca TOHD
U4 TOHD
Ia/Ib/Ic TOHD
I4 TOHD
Ua/Uab TEHD
Ub/Ubc TEHD
Uc/Uca TEHD
U4 TEHD
Ia/Ib/Ic TEHD
I4 TEHD
Ia Fund.
Ib Fund.
Ic Fund.
I4 Fund.
Predicted
Demand
Ua/Ub/Uc
ULN avg
Uab/Ubc/Uca
ULL avg
U4
Ia/Ib/Ic
I avg
I4
kWa/kWb/kWc
Imp./Exp.
kW Total Imp./Exp.
kvara/kvarb/kvarc
Imp./Exp.
kvar Total
Imp./Exp.
kVAa/kVAb/kVAc
Total kVA
P.F.a/P.F.b/P.F.c
Total P.F.
Frequency
Max.
Demand
Ia/Ib/Ic
kW Total Imp./Exp.
kvar Total Imp./Exp.
Total kVA
Table 4-3 Demand Parameters
4.2 Setpoints
The PMC-690 comes standard with 40 user programmable setpoints which provide extensive control by
allowing a user to initiate an action in response to a specific condition. There are 24 Standard Setpoints
and 16 High-Speed Setpoints. Typical setpoint applications include alarming, fault detection and power
quality monitoring.
Figure 4-1 Over Setpoint
Summary of Contents for PMC-690
Page 1: ...PMC 690 Hand Held Power Quality Analyzer User Manual Version V1 0A Aug 27 2018...
Page 21: ...CET Electric Technology 21 Energy Demand Harmonics Spectrum Table Power...
Page 23: ...CET Electric Technology 23 Max Min Setup Basic Device Storage...
Page 24: ...CET Electric Technology 24 Advanced...
Page 26: ...CET Electric Technology 26 Monitoring History Table 3 2 Description of each Hierarchy...