CESSNA
SECTION 6
MODEL 162
EMERGENCY PROCEDURES
GARMIN G300
U.S.
ELECTRICAL POWER SUPPLY SYSTEM
MALFUNCTIONS
LOSS OF ALL ELECTRICAL POWER (EXCEPT PFD)
1.
MAIN CB RESET Switch - PRESS MOMENTARILY
IF ELECTRICAL POWER RESUMES NORMAL OPERATION
2.
Continue flight and land as soon as practical.
IF ELECTRICAL POWER REMAINS INOPERATIVE (EXCEPT
PFD)
2.
Land as soon as possible.
NOTE
The PFD will be operating on the secondary battery only.
The secondary battery is not a back-up battery. It is
included in the electrical system to limit display presentation
issues that might arise during the voltage drop which
occurs during engine start. In good condition, the
secondary battery may provide 5 to 10 minutes of PFD
operation.
3.
Prepare for total loss of electrical power and PFD. Refer to
ABNORMAL LANDINGS, LANDING WITH PARTIAL OR NO
FLIGHT INSTRUMENT INFORMATION
(Continued Next Page)
162PHUS-00
6-19
Summary of Contents for 162 SKYLANE
Page 2: ......
Page 4: ......
Page 18: ......
Page 20: ......
Page 52: ......
Page 54: ......
Page 72: ......
Page 74: ......
Page 104: ......
Page 112: ...SECTION 5 CESSNA PERFORMANCE MODEL 162 GARMIN G300 U S Figure 5 1 162PHUS 00 5 10 ...
Page 114: ...SECTION 5 CESSNA PERFORMANCE MODEL 162 GARMIN G300 U S Figure 5 3 162PHUS 01 5 12 ...
Page 115: ...CESSNA SECTION 5 MODEL 162 PERFORMANCE GARMIN G300 U S Figure 5 4 5 13 162PHUS 01 ...
Page 116: ...SECTION 5 CESSNA PERFORMANCE MODEL 162 GARMIN G300 U S Figure 5 5 162PHUS 01 5 14 ...
Page 117: ...CESSNA SECTION 5 MODEL 162 PERFORMANCE GARMIN G300 U S Figure 5 6 162PHUS 01 5 15 ...
Page 118: ...SECTION 5 CESSNA PERFORMANCE MODEL 162 GARMIN G300 U S Figure 5 7 162PHUS 01 5 16 ...
Page 124: ......
Page 206: ......
Page 232: ......
Page 234: ......
Page 242: ......