2: GENERAL INFORMATION
2:1 INTRODUCTION
This Manual covers Operation, Installation, Com-
missioning and Maintenance of the Oil Fired Pool
Heaters.
The Pool Heaters are :-
Designed for heating pools and Spas by utilis-
ing an
internal water to water heat ex-
changer.
Incorporates its own sealed system
components; pressure vessel, filling loop, safety
valve, and pressure gauge.
Can also be used for space heating.
Supplied with a manual reset limit thermostat.
Suitable for new installations and for replacing
existing Heaters.
Include an internal thermostatic bypass to
maximise the life of the heat exchanger.
All models are supplied as standard with a low
level horizontal firing Oil Burner suitable for con-
nection to a conventional flue.
Note:
The nozzle on this appliance is only covered by a 1
year guarantee.
2:2
PATENTS
The internal baffling system is subject to pending
Patent Application No. GB 9409095.8
2:3
FLUE OPTIONS
The Heaters are designed to operate with high
efficiency compliant with Section L of the Building
Regulations, clean combustion, and low noise
levels.
Choice of flue systems are as follows:
For connection to a conventional flue.
Low level balanced flue, left, right or rear.
Outdoor.
Vertical Balanced flue.
See
Section 9:2
for parts/accessories detail.
The tested balanced flue terminal and connection
affords an adequate supply of air for combustion
and equalisation of pressure between exhaust and
intake as required for operation under unfavourable
wind conditions.
Balanced flues are supplied in a carton that in-
cludes ALL parts for a balanced flue installation.
The horizontal terminals are designed to avoid the
possibility of staining outer walls through which
they pass.
2:4 COMMISSIONING
It is essential in the interest of Heater efficiency
and reliable performance that once the Heater has
been installed it is first commissioned by a qualified
engineer.
If an engineer is not known, The Manufacturer will
be pleased to provide details of an OFTEC*
approved commissioning and servicing engineer
from their list of approved engineers.
See Section 7 for Commissioning Procedure.
It is the responsibility of the Installer
to ensure that the Heater is
commissioned by an OFTEC*
Registered Commissioning Engineer.
*The Oil Firing Technical Association for the Petroleum
Industry, Banstead, Surrey Tel: 0845 6585080.
2:5
SAFETY
READ THE HEALTH AND SAFETY INFORMA-
TION ON THE INSIDE FRONT COVER OF THIS
MANUAL.
Should you wish to remove or
dismantle any covers or parts of the
Heater for cleaning or maintenance
ALWAYS FIRST SWITCH OFF THE
ELECTRICITY SUPPLY.
1. On no account should any part of the Heater or
its Flue be modified.
2. The wiring of the control panel should be as the
wiring diagrams included in this Manual. Wiring
should not be tampered with, modified or
changed for any reason.
3. Only use The Manufacturer’s replacement parts.
Noncompliance with the above will invalidate
the Guarantee.
9-04-02
Summary of Contents for COH110
Page 60: ...14 Fig 4 9b Reillo bypass adjustment 9 04 02 Fig 4 9a Reillo bypass adjustment ...
Page 63: ...17 9 04 02 ...
Page 82: ...36 9 04 02 ...
Page 83: ...37 Model 220 only Fig 8 3c Model 280 only Fig 8 3d Top Top Top 9 04 02 ...
Page 86: ...40 9 3 BURNER PARTS 9 04 02 Model 110 443T58 ...
Page 87: ...41 29 01 08 Model 180 459T55 3007708 ...