,-..
H
ELECTRICAL WIRING
YFO-?
RUN OF THE ELECTRICAL CABLE
1
#c# 3&KE"#'E&!G
N
#c# R"0%*&E
2
#c# 3&KE"c7E&5)
L
#c# M2&$"
3
# c#J"*5+!&E#KE(76
c#/0*!"*c"&*%2
Fig. 2
B
ro
w
n
W
h
it
e
(
5
0
V
)
B
lu
e
=(%(*
3&)&7+%(*
C+5+%#%2"*5($%&%
=&+!#$1+%72
T6A
B
la
c
k
CONTROL BOX
– To remove the control box from the burner,
loosen screw (A, fig. 2) and pull towards the
arrow.
T J2"#)2( %(*"$+$%&!7"#+$#8 +%%"G#G+*"7%E9#+! %(#%2"#7 (!c
%*(E#K(a#P0!G"*!"&%2#%2"#+'!+%+(!c%*&!$8(*5"*Q#(!#&
)E0'c+!#$0))(*%I
230V
~
50Hz
Y&8"%9#%2"*5($%&%
_"5(%"#E(76c(0%#E&5)
P-,OD#c#OIS`#5&aIQB#+8#*"h0+*"G
B
lu
e
B
ro
w
n
J"*5+!&E#KE(76#(8
7(!%*(EcK(a#
530SE
*
D&E;"
:F-A.
Black
H#)+!#)E0'
H#)(E"#$(76"%
ATTENTION:
Do not swap neutral and phase over, follow the diagram
shown carefully and carry out a good earth connection.
J2"#$"7%+(!#(8#%2"#7(!G07%(*$#50$%#K"#&%#E"&$%#.55kI
(Unless requested otherwise by local standards and legislation).
J2"#"E"7%*+7&E#1+*+!'#7&**+"G#(0%#K9#%2"#+!$%&EE"*#50$%#K"#+!#7(5c
)E+&!7"#1+%2#%2"#*0E"$#+!#8(*7"#+!#%2"#7(0!%*9I
/0*!"*c"&*%2
TESTING
32"76# %2"# $20%cG(1!#(8#%2"#K0*! "*#K9# ()"!+!'
%2"#%2"*5($%&%$I
TO BE DONE BY
THE INSTALLER
CARRIED-OUT
IN THE FACTORY
Summary of Contents for COH110
Page 60: ...14 Fig 4 9b Reillo bypass adjustment 9 04 02 Fig 4 9a Reillo bypass adjustment ...
Page 63: ...17 9 04 02 ...
Page 82: ...36 9 04 02 ...
Page 83: ...37 Model 220 only Fig 8 3c Model 280 only Fig 8 3d Top Top Top 9 04 02 ...
Page 86: ...40 9 3 BURNER PARTS 9 04 02 Model 110 443T58 ...
Page 87: ...41 29 01 08 Model 180 459T55 3007708 ...