Figure 29 - Feeder test
All pellets that have fallen into the container should be weighed. The result is the mass
of pellets that should be entered into the controller:
Main menu> Boiler settings> Power modulation>
Feeder> Fuel mass in the test
WARNING!
Feeder test is necessary for proper regulation and operation of the
burner .
WARNING!
Follow instructions in point 3, otherwise pellets feeding dose can be
calculated incorrectly and cause burner incorrect operation.
The feeder cannot have a lower capacity than:
Table VIII - Min. Required feeder capacity for each burner power used in the boiler
no
burner power
feeder efficiency
1
10 kW
≥4 kg / h
2
16 kW
≥4 kg / h
3
20 kW
≥ 5 kg / h
4
26 kW
≥ 6, kg / h
5
36 kW
≥8 kg / h
6.4 Boiler start-up and shutdown
WARNING!
Do not start the boiler if it is not filled with water.
The manufacturer recommends that the first start-up be performed by an Authorized Installer at
the User's request.
The scope of the first launch includes:
checking the correctness of installation and operation of the device,
burner adjustment,
checking the correctness of operation of the device securing elements,
filling out the warranty book.