Moreover, in the variant containing a pump group, the boiler can be connected to the installation
with an anti-condensation valve . It opens the central heating circuit after reaching the temperature
of 45oC
of
water in the boiler. The diagram below shows the principle of operation and valve
connection.
Figure 23 - The principle of operation of the anti-condensation valve
5.6 Connecting to the electrical installation
WARNING!
Electrician qualifications (up to 1kVA) are required to connect the
heating system devices (pumps, actuators, pump groups, solenoid
valves) .
WARNING! - SAFETY INFORMATION
Before connecting the boiler, make sure to that the boiler is
disconnected from any source of voltage!
The boiler is powered by alternating current 230V / 50Hz . The installation should be connected to
the controller located under the cover or the tray (depending on the version) . Cables should be fed
out through glands located on the boiler's rear strip (See Figure 1 - w7). Before connecting the
installation, remove the tray or the cover.